Quote Originally Posted by moombadaze View Post
Started with a little bench testing the factory system




this system put out about 6.6 gpm or would take about 7.5 minutes to fill a 400lb bag up, or about 15 minutes to fill a 750lb bag.

then there is another 400 lb bag waiting to be filled so what is that like a half hour to fill everything up.

I just dont have the patience for this
You have inspired me . i have the new gIII jabsco Ballast and have thought up a way to bump up the fill rate on this system for minimal $, but it will have to wait till april or may.......details to come