Got some awesome news! The Trinity River Authority approved the dredging project for the cut! The plan is to dredge the "Rail Cut" (the long one) 6 ft deep by 3 ft wide for 1500 ft, basically from the entrance of Bethy Creek to the entrance of the River. This will allow passage even if water levels drop a couple feet getting late into those summer months. Now the fundraising begins. I offered to have the Jam help raise funds for this but was told they plan to have it completed before then so that is GREAT news for us!
David
2017 Moomba Mojo Max Surf Edition, 2 Pair Wetsounds Rev10s powered by an SD2, 6 pair Wetsounds XS650M and Wetsounds XS12 powered by SD6 all controlled by a WS420. 2 Lumitec SeaBlaze X2 Spectrum underwater lights
SOLD***2008 Mobius LSV, Gravity III , Wake Plate, Z5, Exile SX65c's, Exile XM9s, Exile XI12D, Exile Javelin, Exile 30.2***SOLD