-
Mojo Surf Ballast Setup
I pretty much followed Gurt's schematic.
I left about an 8" lead coming from the TH by cutting the pipe there. This is where I installed the check valve. Coming out of the check valve, I had another short lead, then a Y. The main leg went to the check valve, one end to the vent of the IBS, and the other to the port on the bosworth for when I don't want to fill the IBS.
At least i think that's how I did it. Again, I followed the very good schematic that was posted.
Matt
2012 LSV
Posting Permissions
- You may not post new threads
- You may not post replies
- You may not post attachments
- You may not edit your posts
-
Forum Rules