been so busy enjoying the lake and trying to break in the new jetski i havent got it done yet. all boards are cut i used the 3/4in water resistant ply wood. all thats left now is to cut the sub hole and assemble the box. i am thinking i may end up carpeting it now because the design did not go as planned so it sticks about 8inches from the old kick panel position, which on our xlv is not a problem because there is sooooo much leg room. pics and final results soon to come.
Boat: 09 Moomba Gravity Games
Tow vehicles: 2002 Tahoe, 2006 Saab 9-7x 5.3i, 2009 Yukon Denali, 1998 Savana 3500
Other toys: 2008 Seadoo GTX 215, 2009 Seadoo RXP-X 255