Results 1 to 10 of 23

Threaded View

  1. #1
    Join Date
    Feb 2008
    Location
    Traverse City, MI
    Posts
    2,680

    Default I got a few projects done this weekend...

    We took the boat out for the first time on Thursday and Friday after its winter hibernation. It was absolutely filthy, and I've got a small backlog of projects that I wanted to get done, so since the boat is now sitting in my driveway I figured I might as well take advantage of the beautiful weather knock some things off the list.

    First up; I installed stainless thru-hull fittings for the bilge, and ballast vent and drain;
    Before:


    These are the fittings I used:


    After:


    Attached Images Attached Images
    2013 Outback V

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •