




So I installed my manual flow tonight. The problem the arms that swing out between base plate and outer plate don't line up at all with any holes. The company also failed to send me the 4 white bushings, 2 shoulder bolts and 4 flat head Allen screws that hold the plates and swing arms the boat machines piece.
Any ideas? Not gonna be screwed out of a grand and get the wrong machines parts or application for wrong boat and to top it off missing valuable screws to finish job.
See pictures
Sent from my iPhone using Tapatalk
2013 LSV Red/White
1100lb upgrades in each rear locker!
Stock 500 Bow ballast
650IBS
Manual Flow equipped
Boards
Hyperlite Hi-Fi "The Illest"
CWB AMG Carbon
Phase 5 Razz
Byerly Volt
4.6 Ronix Koal Fish
Phase Five Scamp (kiddos)