Right now my plan is to use heidis dads tandem axle flat bed trailer to transport it if they want to charge for shipping. From there I will just use a wheel barrow to cart a few slabs at a time to the backyard and repeat till I am done. I would like to get it done in 2 days, 3 pallets one day, 3 pallets the next, or 3 days with 2 pallets each day.
As far as keeping it alive, the nursery said to just water it every day for 30 mins for the first 2 weeks so that is my plan as of right now. I would love to wait till feb or march but with the dogs using the backyard to potty we need grass to prevent a filthy mess of dirt being tracked in multiple times a day.
As far a laborers go, it will be me and Heidi if she is off work but probably mainly me, I don't think we are going to have any money left to hire out any help and plus that just supports the illegal immigration problem lol.
David
2017 Moomba Mojo Max Surf Edition, 2 Pair Wetsounds Rev10s powered by an SD2, 6 pair Wetsounds XS650M and Wetsounds XS12 powered by SD6 all controlled by a WS420. 2 Lumitec SeaBlaze X2 Spectrum underwater lights
SOLD***2008 Mobius LSV, Gravity III , Wake Plate, Z5, Exile SX65c's, Exile XM9s, Exile XI12D, Exile Javelin, Exile 30.2***SOLD