Results 1 to 10 of 433

Hybrid View

  1. #1
    Join Date
    Jul 2008
    Location
    Des Moines, IA
    Posts
    3,237

    Default

    Quote Originally Posted by Razzman View Post
    Hmmm ... I like this idea MUCH better than cutting the floor.
    Same here. The other huge bonus would be that you've also addressed the "stank locker" issue by adding that deck plate. Aaaand you get redundant bilge pumps which is nice peace of mind.

  2. #2
    Join Date
    Apr 2008
    Location
    California
    Posts
    2,840

    Default

    Quote Originally Posted by brain_rinse View Post
    Same here. The other huge bonus would be that you've also addressed the "stank locker" issue by adding that deck plate. Aaaand you get redundant bilge pumps which is nice peace of mind.
    The only real issue I see with this is getting a pump close to the floor. If it's not close it will still leave water there. With a deep v keel that will be a challenge. Now if weep holes can be added as SC suggests that would eliminate the rest. But that would require pulling the gas tank. Hmmm
    2007 Mobius LSV

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •