i have the factory set up didn't touch a thing just added the larger 750 lb bags and it took 14 minutes for them to fill up competely. i am happy with that cause it always takes time to get to the ski zone and get the gear out.
08 lsv all red- dual battery system, kicker 700.5 and 450.2 amp, 10" kicker sub, wetsounds eq, polk db651 cabin speakers, exile xm7 tower speakers, ss thru hull fittings, seadek pad, evolutions cover
https://forum.moomba.com/showthread.php?t=10664