Floors in tomorrow, friday should be fit and finish. 3 walls of T/G tonight, cut sanded and painted... went up pretty quick besides that Window (2nd paint coat going on tomorrow). Cabinets painted, stairs built, and built a custom drop down table extension for the kitchen - will be mounted to the right of the sink, then drop down during transport.
![]()
Last edited by jph3; 06-06-2019 at 03:29 AM.