My boat is in storage so there plan might change when I do the work in the Spring but I plan on a Y pretty close to the bag and separate lines to the IBS legs via there shortest route possible. Might have to drill holes in the floor. Right now I have lines going from the ski locker bag the l to the IBS thru the hole where there battery cables run and under under the console. One files and the other drains


Sent from my iPhone using Tapatalk