Results 1 to 10 of 103

Threaded View

  1. #16
    Join Date
    Nov 2009
    Location
    Stillwater, Oklahoma
    Posts
    400

    Default

    Status update. Bar construction has started. A few pics of design options in progress, work in progress, and a new cold box.

    Not shown in this set are two roll-around EIA, (pro-sound spec) 19" racks. All the AV gear will be in the racks, so I can roll them out to gain easy access to the patch cables and wiring, etc. One will house the AV stuff, teh other will hold at least one of the two comuters that will live out there. One is a dedicated CAD machine and the other is my digital recording studio PC
    Attached Images Attached Images

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •