We are doing the finish out on the inside ourselves. I've got all the insulation already..just waiting for them to have it dried in so my dad and I can get in there and do electrical and sheetrock. I've got a 50" plasma that will go on the back wall behind the truck stall..which will be above the work table.
Those speakers look like the way to go...I just need to decide if they should go in the wall somewhere or if I should put them up on the ceiling so they are out of the way and since it's so far up it will help to not have a loud area at ear level somewhere on the wall in the middle of the building.
My air compressor will be in the storage room side with a switched plug right next to the door so I can have air on demand in the main part and flip the switch to prevent it from running when done. Also the drill press and freestanding belt sander will go over there.
Sent from my SAMSUNG-SGH-I337 using Tapatalk
2006 Supra 20 - Sold
2006 Supra 24 Gravity Games - Sold
2015 Supra SE450 - Sold