Ok, picked up an 1100 and a tsunami pump. I hear you on the full plumb in, and i will get there, but i dont mind having the pump around until then.
As soon as i pulled away from the store, i thought i should have grabbed TWO 1100's then i can use both the stock bags up front. I guess I'm going back.
Two more questions:
1. I still need check valves..... I read above that they are 1" everywhere??? Is that correct? I thought i also read on another thread that they were 1"fill but 3/4" vent???
2. Do you simply splice these in close to the TH?
Thanks,
2012 Mojo2.5
Ballast:
1100 surf side
400 goofy side
500 under floor
725 IBS
260 bow floor
(The more spotters the better)
Acme1235