Results 1 to 10 of 196
Thread: Our new home
Hybrid View
-
02-21-2011, 09:02 PM #1
Mike, hope it all goes smooth for ya and congrats. nothing better than getting it done for the way you want it.
Hey, Its Moomba time
Its all about the dash - enjoy the dash, as that is your time between the dates
13 Mobius LSV-sold
08 Mobius LSV-sold
03 Mobius LSV-sold
life is about finding the balance between being a responsible adult and staying young at heart
-
02-21-2011, 11:14 PM #2
Make sure you have a lawyer. Kind of like insurance - yo hope you don't need it, but nice to have when you do.
If you believe something to be true, it will be - in it's consequences.
2009 MasterCraft ProStar 197 - DD - 5.7L - 325HP - Zero Off
-
02-22-2011, 09:56 AM #3
congrats..
I really miss building houses. I truely love taking a bare chunk of ground and creating a house out of that vision. last place I lived in was 2240sqft and was designed/built/dreamed up by me.
some cities are harder than others, but being a general on a house is amazingly easy..
really wish the housing market here would not have tanked. I'd much rather be building than working at a desk all day
holla if you have any questions..
don't know about the electrical laws in portland, but here, anything coax/home audio is considered low voltage and not subject to inspection. run wires for whole house audio and a pair in the garage/back patio. even if you don't install now, just leave the wires in the ceiling. you won't be sorry later. hope you're putting in a dedicated data panel, and make sure you run dual coax to each room and 4 to the location on the house for sat. never hurts to be preparedLast edited by sandm; 02-22-2011 at 10:00 AM.
'06 Supra Launch 20SSV-gone but never forgotten
-
02-22-2011, 02:42 PM #4
Thanks yea i snuck this in on the builder LOL. In the offer to the house we asked the Builders agent if i can run all my wires after the electrical inspection and before drywall. He said nope. So then i tossed that same wordage into the contract when making the building bid. They never rejected it so its in the contract now LOL.
I was talking with Brain at Exile about all this too. We are going to order some cables and do it on the weekend after the electrical. Its a ways down the road till we are at that point but yea i am planning all that stuff.Malo <--- Means--Evil or Mean One. This explains a lot.
2013 Mojo 2.5 Skylon Tower. Bestia < Beast >
[COLOR="#696969"]
-
02-22-2011, 02:48 PM #5
Mike, Congrats on the lot and new future home.
I had all the intentions of doing that 6 years ago and totally missed the time frame and the drywalll went up quickA Day at the Lake...Priceless
A Day in Powder...Endless
Joe V
2012 Möbius XLV~ Loaded & Exiled
2007 Outback V ~ sold