Thread: Our new home

Hybrid View

  1. #1
    Join Date
    May 2009
    Location
    North End Lake Lanier GA
    Posts
    8,155

    Default

    Double G concrete crane truck very cool to watch



    Malo <--- Means--Evil or Mean One. This explains a lot.
    2013 Mojo 2.5 Skylon Tower. Bestia < Beast >
    [COLOR="#696969"]

  2. #2
    Join Date
    May 2009
    Location
    North End Lake Lanier GA
    Posts
    8,155

    Default

    More foundation and Stem wall installed.




    Malo <--- Means--Evil or Mean One. This explains a lot.
    2013 Mojo 2.5 Skylon Tower. Bestia < Beast >
    [COLOR="#696969"]

  3. #3
    Join Date
    May 2009
    Location
    North End Lake Lanier GA
    Posts
    8,155

    Default

    The double G at work and it was impressive to watch them pour footings and the stem wall.




    Malo <--- Means--Evil or Mean One. This explains a lot.
    2013 Mojo 2.5 Skylon Tower. Bestia < Beast >
    [COLOR="#696969"]

  4. #4
    Join Date
    May 2009
    Location
    North End Lake Lanier GA
    Posts
    8,155

    Default

    Footings for the floor then the wall.




    What i no longer have is a gangster roll.

    Malo <--- Means--Evil or Mean One. This explains a lot.
    2013 Mojo 2.5 Skylon Tower. Bestia < Beast >
    [COLOR="#696969"]

  5. #5
    Join Date
    May 2009
    Location
    North End Lake Lanier GA
    Posts
    8,155

    Default

    Lumber time. Studs for the floors and mud wall material.




    Also the under floor plumbing and heating system are going in.
    We are using a new poly style pipe for the plumbing, it flexes if it freezes and they say its cheaper material to use.

    Malo <--- Means--Evil or Mean One. This explains a lot.
    2013 Mojo 2.5 Skylon Tower. Bestia < Beast >
    [COLOR="#696969"]

  6. #6
    Join Date
    May 2009
    Location
    North End Lake Lanier GA
    Posts
    8,155

    Default

    This is when the site manager tells me they forgot to add foundation for the Bay window we are having installed, its a week delay to get the foundation people out, and concrete poured so the floor and walls are delayed till next week. Its ok though because in the great time line this wont effect finish date.



    Thats all the updates till next week.
    Malo <--- Means--Evil or Mean One. This explains a lot.
    2013 Mojo 2.5 Skylon Tower. Bestia < Beast >
    [COLOR="#696969"]

  7. #7
    Join Date
    Jan 2008
    Location
    Pensacola, FL
    Posts
    1,585

    Default

    At least you got a picture of that lumber before the neighbors started "acquiring" it at night.

    I like the progress of the concrete form pourer.
    1997 MasterCraft 205

    2008 Moomba Outback
    1999 MasterCraft Sportstar OB
    1992 MasterCraft 205
    1999 Malibu Response LX
    1987 Marlin Magnum Skier

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •