House garage mod has started!!!
A few weeks ago, I am sure that many of you may remember me asking for measurements on your garages, well this week the house mod hase started. My basement is very large, but is cut in half by load bearing 2x6s and they have got to go. The boat is sitting outside today in the rain and that just isn't going to do. I will update with more pictures when they have completed the job. They just left to go pick up a 6x6x25 20' I-beam to span the removed boards. I figure the baot will be in by the weekend if the rain stops and the yard dries enough to be driven through.
Boat sitting in the rain, it has been under covered storage all year except for this week and it has not rained in forever!!!
http://i132.photobucket.com/albums/q...avesMod011.jpg
Garage before the modification:
http://i132.photobucket.com/albums/q...n/Naves044.jpg
http://i132.photobucket.com/albums/q...n/Naves045.jpg
Garage Update...SUCCESS!!!!!
We loaded the boat into the garage this weekend, everything went smoothly and she fit perfectly!! We started by backing the boat through the garage door with the Tahoe. Once the boat was inside we jacked it up and put dollies under the tires and left it connected to the truck. Then we pushed the boat as far to the side as we could and removed the dollies and unhitched from the truck. Then it was simply swing the tongue to the far wall and rolled her to the back of the basement. I still have not figured out what I want to do with the tower so we just put it on the floor/trailer for now. I think it will end up getting suspended from the ceiling to keep it out of the way of my winter projects.
http://i132.photobucket.com/albums/q...vesBoat007.jpg
http://i132.photobucket.com/albums/q...vesBoat004.jpg
http://i132.photobucket.com/albums/q...vesBoat001.jpg
http://i132.photobucket.com/albums/q...vesBoat002.jpg