    When i got mine it was 2 months later then originally quoted as delivery time by the dealer.

  2. #12
    Join Date
    May 2018
    Posts
    4,916

    Default 2023 Max Build ?'s

    All depends on when your build slot is.

    Dealers get only so many build slots and they are distributed throughout the build year. They are not first come first serve.

    In 2020, I ordered boat in Sept, order was accepted by SC in October for an end of December build slot. Build was started around Dec 15th and completed Dec 30th, it took awhile to ship due to pandy, but arrived at dealer Jan 26th.

    Moombas build 4-5 days faster than a Supra, but SC’s build rate is very consistent.

    Ask your dealer what build slots they have available. Then add 2 weeks from that build date to build, 2-4 weeks to ship it to your dealer, 1 week for dealer to prep and deliver.

    My 2018 build slot was May 7th and I had boat June 27th, appx 7 weeks.

    I highly recommend the SC tour, impressive process and helps you understand the difference of a boutique vs mass production boat build. SC has only so many boats they can produce per year with maybe a little wiggle room.


    Sent from my iPhone using Tapatalk
    Last edited by larry_arizona; 07-02-2022 at 09:12 AM.
    2021 Supra SA 400
    2018 Supra SA 400 (SOLD)
    Michigan

  3. #13
    Join Date
    Mar 2022
    Location
    FL and PA
    Posts
    28

    Default

    Quote Originally Posted by NedFlanders13 View Post
    Thank you all for the input! I’m sure this topic has been done to death, but was hoping to get current info from you guys on the options I’m kicking around. Such a big purchase and I’m terrified of rising interest rates which are sure to push this to the brink of affordability for me haha.

    Does anyone have input on what their realistic timeline was on their build? I have slot held, but if we actually place the order once the 2023 catalog is live in the next few weeks, is it realistic to think we’ll have the boat in the Spring? Thanks again!
    We reserved ours in June of 2021, got the call that it was our turn to build in October. Our boat was then ready for pickup in mid February. So, assuming “supply chain issues” don’t get worse, you should have it by next spring I would think.
    ‘22 Moomba Max
    Wakemakers factory bag upgrade (yes its worth it)
    Surf Regular, plate at 65, speed 11.1, pitch: 8.5, roll: -1.5
    Still tinkering with everything

  4. #14
    Join Date
    Feb 2018
    Location
    Boating on Lake Martin, AL
    Posts
    1,523

    Default

    Our timeline was:

    • Put deposit down at boat show Jan 2019
    • Spray date and factory tour April 2019
    • Boat delivery at dealer May 2019
    2019 Moomba Max "MOOMBAE"
    Mods: Wakemakers upgrade + 500 lbs of lead
    2016 Yamaha AR192 - sold

  5. #15
    Join Date
    Jun 2020
    Location
    Reno, NV
    Posts
    741

    Default

    We finalized our build and deposit Dec. 12, 2021. Spray date Jan. 26, 2022, with delivery to dealer Mar. 15, 2022. Took delivery Mar. 23rd. This was during Onicron waves, supply stream disruptions, and Russian mayhem. 3.5 months wasn’t a long wait.


    2022 SA 450
    2020 SA 450 Wife calls it White Cloud. Said it makes her feel "Classy"
    2017 Sanger V215sx. We call it Viagra because it's the little blue pill that gets everyone up (Sold)

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •