    Default How long does it take to build a new moomba Craz

    Hello
    I am looking at a new Moomba craz for my family for the upcoming summer. I talked to my dealership and they said that they have a space open to start building in may but did not include a time when it would be done. Does anyone know a rough estimate on how long it would take to build the boat? I was hoping that I could get it by mid June.

  2. #2
    Join Date
    Jan 2017
    Location
    Katy, TX
    Posts
    1,678

    Default

    It take 6-7 days to build from your spray date, a few days for shipping and a few days for dealer prep. Mid June is pretty doable unless your slot is towards the very end of May.

    Sent from my Note9 using Tapatalk
    2017 Moomba Craz Surf Edition
    Flow 2.0 Surf System w/ AutoWake™
    5,600 Lbs Ballast - Enzos + Lead + Sumo
    Wet Sounds REV10s + REVO12-XXX

  3. #3
    Join Date
    Jan 2018
    Location
    Lexington, KY
    Posts
    369

    Default

    What he said.

    My boat was sprayed April 20-something, and I was on the water in it on May 8th. Now, I'm only 2 hours from the factory, so trucking didn't take long at all, and my dealer was right on getting it unloaded and prepped. Shipping could take longer than the actual build in many cases.
    2018 Moomba Craz | Autowake 2.0, Zero-Off, G6 Pumps | Captain Blue/Dark Graphite/Silver Flake | Enzos + Lead

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •