How long does it take to build a new moomba Craz
Hello
I am looking at a new Moomba craz for my family for the upcoming summer. I talked to my dealership and they said that they have a space open to start building in may but did not include a time when it would be done. Does anyone know a rough estimate on how long it would take to build the boat? I was hoping that I could get it by mid June.
-
02-06-2020, 09:16 PM #2
It take 6-7 days to build from your spray date, a few days for shipping and a few days for dealer prep. Mid June is pretty doable unless your slot is towards the very end of May.
Sent from my Note9 using Tapatalk2017 Moomba Craz Surf Edition
Flow 2.0 Surf System w/ AutoWake™
5,600 Lbs Ballast - Enzos + Lead + Sumo
Wet Sounds REV10s + REVO12-XXX
-
02-07-2020, 01:16 PM #3Senior Member
- Join Date
- Jan 2018
- Location
- Lexington, KY
- Posts
- 369
What he said.
My boat was sprayed April 20-something, and I was on the water in it on May 8th. Now, I'm only 2 hours from the factory, so trucking didn't take long at all, and my dealer was right on getting it unloaded and prepped. Shipping could take longer than the actual build in many cases.2018 Moomba Craz | Autowake 2.0, Zero-Off, G6 Pumps | Captain Blue/Dark Graphite/Silver Flake | Enzos + Lead