    Default Ballst: To manifold or not to manifold? That is the question?

    Title says it all. I'm getting ready to install a ballast system from scratch on my 2000 Mobius V. I'm wondering If I should consider manifolding the three fill pumps or to do individual thru hull fittings for each pump? I'm using that Tsunami pumps and have three for fill and free for drain. I think manifolding would make for an easier install, but I don't want to choke my pumps. I'm fine with fill times around 7-10 minutes. That's not the end of the world for me...

    Thanks in advance.
    -Scott

    2000 Moomba Mobius V

  2. #2
    Join Date
    Jan 2008
    Location
    Tallahassee, FL
    Posts
    14,071

    Default

    I scrapped my manifold and built a bigger one then scrapped it completely in a later revision. Now I have dual pumps to each rear bag off of two thru-hulls with two hoses running to each. Fills fast. Used check valves to keep water from draining. Route your empty lines to the opposite sides to prevent draining through the drain pumps. Then I have a single thru hull with a single pump going up front. Piggybacked a small IBS off the front bag. Takes a little longer than the rears to fill but we usually start by filling only the front bag for wakeboarding with the smaller kids so I'm ahead of the game when we fill to surf.
    My Mom said I'm not allowed to get wet!
    2008 LSV (sold)
    2000 Outback LS (sold)
    LLTR!!!!!!!!



  3. #3
    Join Date
    Oct 2010
    Location
    Lake Wylie NC Area
    Posts
    2,467

    Default

    A manifold in of itself, will not choke the pumps. Ideally, you would want a manifold that can support the flow of the pumps. This can be done. The issue with a common manifold for 3 or more aerator pumps, is having room for the complete setup and room to orient the pump bodies and outlet, in order to prevent air lock. Shallow and/of cramped bilges are not favorable to aerator pumps and a large common manifold can compound the issue.

  4. #4
    Join Date
    May 2018
    Location
    Waynesville, Ohio
    Posts
    481

    Default

    I scrapped the garbage sprinkler pump system in my 05 Supra and replaced it with the wakemakers upgrade kit. It was $1,000 but worth every penny. I installed 2 new thru Hull fittings. Don’t be scared, it was not hard. Just follow their instructions to a T and you will be fine. Personally, I don’t see how you would NOT be chocking off some flow by manifolding multiple pumps. If you are combining 3 pumps with 1” hose into one thru hull fitting, it has to reduce flow. Unless I am misunderstanding how you are proposing to install it.


    Sent from my iPhone using Tapatalk

    2018 Moomba Craz
    6.2L Raptor 400
    6 Pump Ballast, Autowake 2.0, Flow 2.0 Surf System
    OJ 15x13 Wake Prop
    Digital Cruise Pro 3 (paddle wheel)
    Wetsounds Rev 10's

    2005 Supra Launch 22SSV - Sold

  5. #5
    Join Date
    Oct 2010
    Location
    Lake Wylie NC Area
    Posts
    2,467

    Default

    I don’t see how you would NOT be chocking off some flow by manifolding multiple pumps. If you are combining 3 pumps with 1” hose into one thru hull fitting, it has to reduce flow.
    Thats because you inserted your own "hose" size, rather then make a calculation based on flow rate. How did you come up with 1"?

    As stated above;

    Ideally, you would want a manifold that can support the flow of the pumps.

  6. #6
    Join Date
    May 2018
    Location
    Waynesville, Ohio
    Posts
    481

    Default

    Quote Originally Posted by MLA View Post
    Thats because you inserted your own "hose" size, rather then make a calculation based on flow rate. How did you come up with 1"?

    As stated above;
    I had 3 pumps going to 3 bags using 1” dia hose. If all 3 of those are either filling or draining from one single 3/4” through hull fitting, I would assume it would choke off some supply. I am guessing that is why wakemakers sells two additional thru hull fittings with the kit. However, no I did not make any flow rate calculations. In my opinion it would be no different than hooking up a 3/4” garden hose to a wall hydrant, then splitting (3ea) 1” hoses off that. You can only supply as much water as the single 3/4” hose will flow.


    Sent from my iPhone using Tapatalk

    2018 Moomba Craz
    6.2L Raptor 400
    6 Pump Ballast, Autowake 2.0, Flow 2.0 Surf System
    OJ 15x13 Wake Prop
    Digital Cruise Pro 3 (paddle wheel)
    Wetsounds Rev 10's

    2005 Supra Launch 22SSV - Sold

  7. #7
    Join Date
    Oct 2010
    Location
    Lake Wylie NC Area
    Posts
    2,467

    Default

    Quote Originally Posted by jcarter20 View Post
    I had 3 pumps going to 3 bags using 1” dia hose. If all 3 of those are either filling or draining from one single 3/4” through hull fitting, I would assume it would choke off some supply. I am guessing that is why wakemakers sells two additional thru hull fittings with the kit. However, no I did not make any flow rate calculations. In my opinion it would be no different than hooking up a 3/4” garden hose to a wall hydrant, then splitting (3ea) 1” hoses off that. You can only supply as much water as the single 3/4” hose will flow.


    Sent from my iPhone using Tapatalk
    First off, the pumps the OP is using is unknown at this point, and so far, I dont know what your pumps are either. The OP stated "Tsunami", but thats series of pumps, not a specific pump. You can get a 500, 800 and 1200 in the Tsunami line.

    Once the pump's flow rate is known, its easy to build a manifold with a flow rate to more than supply the chosen pumps.

    A 1" manifold, as in 1" from hull to pump, can support 3 500 GPH pumps, no worries. it can support 3 800, but getting a little close, so I prefer a 1.25" A 1" can support 2 1200 GPH pumps, but a 1.25" setup is best for 3-4. The entire intake setup has to accommodate the flow, not just the section the pumps connect to.

    In your setup, it sounds as if you used an existing .75" thru-hull for 3 pumps of whatever GPH. This could be an issue. The OP says he's starting from scratch, so a mistake easily avoided during his design phase, as stated.

  8. #8
    Join Date
    Sep 2016
    Location
    Horseheads, NY
    Posts
    59

    Default

    Sorry for the confusion guys! I'm using (3) 800 gph pumps.
    -Scott

    2000 Moomba Mobius V

  9. #9
    Join Date
    Jan 2008
    Location
    Keuka Lake, NY
    Posts
    7,692

    Default

    Your going to need at least 6 pump with individual fill and drains and then you need to do three anti siphon loops on all the fill lines

    Going reversible is your best bet and will add some value to the boat as well
    A Day at the Lake...Priceless
    A Day in Powder...Endless


    Joe V
    2012 Möbius XLV~ Loaded & Exiled
    2007 Outback V ~ sold

  10. #10
    Join Date
    Sep 2016
    Location
    Horseheads, NY
    Posts
    59

    Default

    Joe, Sorry I was talking about fill pumps. I have (3) 800 gph fill pumps that I'm debating to manifold or not. I then have (3) separate drain pumps (also 800 gph). And I'm using electric ball valves instead of sprinkler valves