Results 1 to 10 of 329
Threaded View
-
02-20-2014, 05:11 PM #11
Only thing that you should be able to hold consistent is Hours charged for shop time. Not cost.
SC should have an expected amount of Hours to install, say 3 hours.
Then you pay 3 hours labor to install at your shops rate.
The cost of the Flow will vary but it shouldn't vary a lot because there is an MSRP to everything.
Just like buying a Boat, SC can tell you the MSRP of the boat, but the final cost of the boat is always up to the dealer selling the boat.
When we get ours installed I will share the Labor Hour charge, but the Shop charge and the price of the Flow will be different in my world then in yours I'm sure.Malo <--- Means--Evil or Mean One. This explains a lot.
2013 Mojo 2.5 Skylon Tower. Bestia < Beast >
[COLOR="#696969"]