Page 2 of 2 FirstFirst 12
Results 11 to 18 of 18
  1. #11
    Join Date
    Jun 2008
    Location
    Henderson, NV
    Posts
    7,020

    Default

    I gave up on drywall after one attempt. I consider myself very handy when it comes to housing, remodels and building, but drywall and plumbing are the 2 things I don't do... ever...

    came home one sunny day in a prior house and found it raining in the garage from the drywall seams. I was about an hour away from having a garage ceiling on the floor..

    I, for one am grateful for all the equipment and machinery and gladly give up any and all needed space for it.. my tight pocketbook says it's cheaper than a brazillian
    '06 Supra Launch 20SSV-gone but never forgotten

  2. #12
    Join Date
    Jun 2007
    Location
    Vancouver, WA
    Posts
    5,456

    Default

    I watched some of the remodeling you did at your last house quite intently as I like to think of myself as handy too but.... I'm always learning. The next potential sheet rock job may get outsourced since it's a lot bigger job and hopefully I'm getting older and wiser.
    So when is this "old enough to know better" supposed to kick in?

    2001 MobiusV - Slightly Modified...

  3. #13
    Join Date
    Mar 2003
    Location
    Springfield Missouri
    Posts
    3,391

    Default

    I'm meeting on Friday with a company that is remodeling the master bedroom and bath. I'll be doing the tear out and that is about all I can do. I'm doing granite countertops, leaving the cabinets and trashing the fiberglas shower and doing all tile including the bathroom floor. I'm adding a bench to the shower in preparation of my geriatric days. I won't get started after the first of the year.

    Gotta do something to pass the winter time away.
    1998 Mobius
    310 HP PCM
    SOLD

  4. #14
    Join Date
    Aug 2009
    Location
    Montana
    Posts
    3,062

    Default

    Thanks for the compliments guys. I keep saying I'll pay for the experts to come in and do it but then when I put the pencil to it I end up tackling it myself and basically pay for the tools that I get to keep in the end. Plus some of it is therapy for me....I need projects to keep me busy!

    But I would have to say I HATE drywall too!

    I used cement backerboard for the tile. Ripped out the tub/shower enclosure and the builders just used sheet-rock above the enclosure. That is part of the reason I ripped that crap out. It was starting to bubble and peal and always irritated me when I looked at it. How hard would it have been to use greenboard or cementboard there. Shortcuts like that piss me off. So out it came and cementboard when in.
    It took a ton of time to measure it all out and make sure I got a tub that fit perfectly so I could build a front panel and the tile would line up perfectly on the existing wall. Had to notch out the studs on the plumbing side to get the tub to slide in and it was a tight fit. Yanked out all the plumbing and re-did all of that for the hand-shower and anchored the plumbing the right way using studs instead of the cheap plumbers tape that most subs use nowadays.
    The shelve cutouts were a must so I built those into the existing wall, lined them with cementboard, and then when it came to tiling, it just took alot of patience and planning to ensure that the pattern would flow through. It's alot like putting a puzzle together.
    I used the new Epoxy Grout and got it through Daltile. The stuff is the chit!!! It's a bit more expensive and it is very labor intensive and you only have about 90min of time that it is workable before it sets up. And then you have another 90min of cleanup with a pre-clean and final clean. If you mix up too much you are in a pickle. And if you don't mix up enough then you are locked into another 3 hr session for the next go round. Definitely need to plan ahead. It took me 2 full units in 2 separate sessions with a buddy helping spread it both times. But it sets up extremely hard, no need to seal, and maintenance free!
    All in all - I'd probably do it again

    2007 Moomba Outback - going, going, GONE
    2015 "NOT A MOOMBA"

    Why Not? Play Hard! Get wet

  5. #15
    Join Date
    Jun 2008
    Location
    Henderson, NV
    Posts
    7,020

    Default

    heard a lot of good things about that grout. never did use it as it's pretty new on the scene still and most of my tiling was 5-10years ago. supposed to be the way to go in kitchens but did hear expensive and hard to work with.

    not sure if I'll mess with it next year in the bathroom. we'll see. going to do travertine again. I love working with natural stone vs porcelain/ceramic. so much cleaner and easier to cut and it really looks nice but hard to level. debating about doing heated floor. runs around $400 for a warmtiles setup but having a toasty warm floor in the middle of winter is the cats pajamas
    '06 Supra Launch 20SSV-gone but never forgotten

  6. #16
    Join Date
    Mar 2003
    Location
    Springfield Missouri
    Posts
    3,391

    Default

    Wow, I learned more from this thread. I didn't realize the different products being used. I have my meeting with the planner tomorrow for doing the bathroom and I will asking about what products they use and the different boards. Thanks for the info and send more if you got it.

    I apologize if I hijacked this thread but I wanted to give kudos to those providing me information that will be helpful.
    1998 Mobius
    310 HP PCM
    SOLD

  7. #17
    Join Date
    Jan 2008
    Location
    Pensacola, FL
    Posts
    1,585

    Default

    If you are going to tile the floors, look at a floor warming product. I used and electric low voltage heater under a bathroom floor. It was nice to walk onto warm floors in the winter time. Easy to put in while doing tile or wood.
    1997 MasterCraft 205

    2008 Moomba Outback
    1999 MasterCraft Sportstar OB
    1992 MasterCraft 205
    1999 Malibu Response LX
    1987 Marlin Magnum Skier

  8. #18
    Join Date
    Mar 2008
    Location
    Vancouver WA
    Posts
    3,034

    Default

    The epoxy grout is awesome but can be a B1TCharley to mix without bubbles.
    Nice job bro, looks great!


    PWI as usual...

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •