Results 1 to 10 of 188
Thread: Just Closed
Threaded View
-
04-01-2013, 01:46 PM #11
Right now my plan is to use heidis dads tandem axle flat bed trailer to transport it if they want to charge for shipping. From there I will just use a wheel barrow to cart a few slabs at a time to the backyard and repeat till I am done. I would like to get it done in 2 days, 3 pallets one day, 3 pallets the next, or 3 days with 2 pallets each day.
As far as keeping it alive, the nursery said to just water it every day for 30 mins for the first 2 weeks so that is my plan as of right now. I would love to wait till feb or march but with the dogs using the backyard to potty we need grass to prevent a filthy mess of dirt being tracked in multiple times a day.
As far a laborers go, it will be me and Heidi if she is off work but probably mainly me, I don't think we are going to have any money left to hire out any help and plus that just supports the illegal immigration problem lol.David
2017 Moomba Mojo Max Surf Edition, 2 Pair Wetsounds Rev10s powered by an SD2, 6 pair Wetsounds XS650M and Wetsounds XS12 powered by SD6 all controlled by a WS420. 2 Lumitec SeaBlaze X2 Spectrum underwater lights
SOLD***2008 Mobius LSV, Gravity III , Wake Plate, Z5, Exile SX65c's, Exile XM9s, Exile XI12D, Exile Javelin, Exile 30.2***SOLD