Got my LSV setup today. Took around 4 hours in 100 degree heat. Props to Salyers for the boiling water trick. I put the connectors in the freezer while the water came to a boil. I would then put the end of the line in the water for about 10 seconds, and then the cold connectors would slip right in.

I'll be on the lake first thing in the morning to try it out. Thanks for the great thread.