Results 1 to 10 of 197
Thread: Mojo Surf Ballast Setup
Threaded View
-
04-17-2013, 04:35 PM #11
Surprising with 1500 up front i still have a good 2-3 feet of nose out of the water when she is approaching you at idle
Pumps will be fine
Fill time should be apx 1 minute per 100 lbs of ballast. 6-7minutes for the 650s and 10-12 minutes for the 1100s
That board is fine for what your doing, as in learning, there is another thread talking about boards to try out.
General rule of thumb, the lighter a board is the faster it is in the water, and the more expensive a board is the lighter and faster it is in the water.
https://forum.moomba.com/showthread....ards-Which-oneMalo <--- Means--Evil or Mean One. This explains a lot.
2013 Mojo 2.5 Skylon Tower. Bestia < Beast >
[COLOR="#696969"]