(DONE) Move batteries from stern to front passenger compartment
(DONE) Upgrade Tower Amp
(DONE) Upgrade Cabin Speakers
4) Redo front of sub enclosure
(DONE) Complete ballast system overhaul - 1100 bags in rear both sides, 750 in belly, T1200 pumps filling and draining everything, all new switches/wiring
6) New cover, possibly rear deck upholstery redone/repaired
(DONE) New trailer tires & spare tire mount - (Well at least the spare part anyway)
(DONE) New skid steps on trailer
(DONE) New guide bunk pads
(DONE) Small trailer fender dent repair
12) Add more LED accent lighting
(IN PROGRESS) iPod Nano touch mounted by driver stereo remote
(DONE) General cleanup and tightening anything with a screw, nut or bolt on it
(NEW/DONE) Moved driver side stereo remote.
I think next for me will be the LED lighting after looking at another one of Mr Ashton's fine updates :p I've got a box of strips, cuholder and other modules just sitting there waiting to go in!