4 Attachment(s)
I got a few projects done this weekend...
We took the boat out for the first time on Thursday and Friday after its winter hibernation. It was absolutely filthy, and I've got a small backlog of projects that I wanted to get done, so since the boat is now sitting in my driveway I figured I might as well take advantage of the beautiful weather knock some things off the list.
First up; I installed stainless thru-hull fittings for the bilge, and ballast vent and drain;
Before:
https://forum.moomba.com/attachment....1&d=1270427657
These are the fittings I used:
https://forum.moomba.com/attachment....1&d=1270427657
After:
https://forum.moomba.com/attachment....1&d=1270427657
https://forum.moomba.com/attachment....1&d=1270427657